From gold to copper mines, and from a one-year to a three-year term, TONLY's cooperation scope and service period for the Vangtat Gold Mine project in Laos have been further expanded.
Recently, TONLY signed a new full-service management agreement with DAK CHUENG MINERAL EXPLORATION SOLE CO., LTD. Following the one-year cooperation at the Vangtat Gold Mine, the two parties will further collaborate on a copper mine project, extending the service period to three years. The new project will cover 115 units of TL875 and TL891 mining dump trucks, continuing the full-service management model to support the daily operation and maintenance of mining equipment.

In the early stages of the Vangtat Gold Mine project, equipment O&M faced several practical challenges: low effective vehicle availability, four maintenance teams operating under different systems, poor workflow integration, decentralized spare parts management, and some vehicles being grounded while waiting for parts. These issues restricted equipment utilization efficiency and transport scheduling.
To address these pain points, TONLY's service team coordinated closely with the mine management team to streamline equipment management and O&M processes, optimizing solutions across personnel deployment, maintenance operations, and spare parts support.
Strengthened on-site technical support: Stationed professional service personnel at the mine to rapidly handle on-site faults and provide technical support.
Unified maintenance resources: Centralized dispatching of on-site maintenance forces to ensure orderly and coordinated repair operations.
Implemented preventive maintenance mechanisms: Standardized daily maintenance and routine inspections, shifting from a reactive "fix-it-when-it-breaks" model to proactive maintenance.
Optimized the spare parts system: Planned key spare parts inventory in advance, established stock warning mechanisms, and shortened parts waiting periods.
Following continuous optimization, the vehicle availability at the mine has significantly increased, and operational stability has been markedly improved.

The client noted: "After introducing the full-service management, TONLY's team takes unified responsibility for equipment support at the mine. Maintenance, repairs, and spare parts are integrated into a single system, so we no longer need to coordinate multiple repair teams. With stabilized availability, transport planning has become much easier."
Building on the successful cooperation of the previous project, the two parties finalized the full-service agreement for the new mine. The new project features 115 main mining trucks with a three-year service term, continuing the full-service management model.

Compared to the previous project, the new project adopts a collaborative model combining Chinese technical personnel and local service teams, forming a larger service team in which local staff account for 80%. This staffing model balances technical support and on-site service needs. While the localized team handles basic O&M, the Chinese team provides technical backup, adapting to the larger operational volume and longer service period of the new project.
The signing of this new contract signifies that the cooperation has expanded from the original mine to a new mineral project, with a simultaneously extended cooperation period. Once the project is launched, TONLY will tailor the service team and support solutions based on the mine's operational scale, on-site production needs, and local resource conditions, continuously refining services with a focus on core metrics such as equipment availability, response speed, and spare parts supply.
From single-mine O&M to continuous cross-project cooperation, TONLY will continue to iterate and improve the TONLY CARE full-lifecycle service system based on the operational characteristics of different mines, safeguarding the long-term stable operation of mining equipment.